Zodiac eXO iQ power-supply assembly
Diagram position: 4
Service power-supply assembly listed by Vágner as the eXO iQ transformer set. Replacement requires checking the revision and wiring of the specific control unit.
Catalogue reference: WR0821700.
Pool specialist’s view
Service power-supply assembly listed by Vágner as the eXO iQ transformer set. Match a power component to the exact controller revision and diagnosis. A general error or failure to start production alone is not a sufficient reason to replace it.
Zodiac eXO iQ power-supply assembly
Service power-supply assembly listed by Vágner as the eXO iQ transformer set. Replacement requires checking the revision and wiring of the specific control unit.
Identification and selection
Diagram position: 4
Catalogue reference: WR0821700
Replacement and checks
Switch off and disconnect power before servicing. Have a qualified technician diagnose and replace electrical components, compare the wiring, connector version and specific unit revision, and verify correct operation afterwards.
If unsure about the version, send photos of the original component and equipment label to info@chemie-bazen.cz.
Position in the assembly
The blue arrow identifies the component in the original drawing. The unmarked original is retained in the gallery.

Choosing this part correctly
Compare the board or supply-assembly reference, connector layout and device model. The measuring board, control panel and power section perform different functions.
What to check during replacement
This component is intended for professional repair of the electrical section. After fitting, check wiring and operation of the cell and other connected parts according to the service procedure.
Product rating
Be the first who will post an article to this item!
Discussion
Be the first who will post an article to this item!