Injection valve 3/8" for Zodiac pH, chlorine Expert, Gen pH, Gen chlorine 1,5L
⅜″Compare connections and the original configuration before ordering.
Code: 9900107028Select your station and find the correct part by diagram position, name or code. Shared parts are listed once; probes and electronics are distinguished by application.
Position — = part without a separate number in the supplier overview. * = alternative requiring a specification check; see its row.
Compare connections and the original configuration before ordering.
Code: 9900107028
Individual calibration solution. Follow the value specified by the station manual; for ORP, also check the calibration reference setting. This is not the original Zodiac sachet set.
Code: A930330R
Individual calibration solution. Follow the value specified by the station manual; for ORP, also check the calibration reference setting. This is not the original Zodiac sachet set.
Code: A930331R
Individual calibration solution. Follow the value specified by the station manual; for ORP, also check the calibration reference setting. This is not the original Zodiac sachet set.
Code: A930352R
For pH Expert. Do not substitute an ORP probe.
Code: S9900106237
For Chlor Expert. Do not substitute a pH probe.
Code: S9900106238
For pH Expert. Do not substitute an ORP probe.
Code: WR0819800
For Chlor Expert. Do not substitute a pH probe.
Code: WR0819900
Compatible 1.5 l/h squeeze tube: 6 × 10 mm, 135 mm without end fittings. Compare the dimensions and end fittings of the original tube.
Code: S9900106236
Diagram excerpt
Suction assembly for drawing dosing liquid from its container. Compare length, end fittings and the original assembly.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Check before use: the original list specifies 4 × 6 mm tubing. This product has a 6.35 mm outer diameter. Compare fittings; it is not a dimensionally identical replacement.
Code: 13278
Compare connections and the original configuration before ordering.
Code: 219605003
Diagram excerpt
Injection valve adapter shown as position 10. Check the threads on both sides before ordering.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Compare connections and the original configuration before ordering.
Code: 9900107027
Compare connections and the original configuration before ordering.
Code: WR0824600
Diagram excerpt
Electronics for the pH version in the supplier list. Not interchangeable with Chlor Expert electronics. Match the board code and station label.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Diagram excerpt
Electronics for the chlorine version in the supplier list. Compare board code, connectors and station label before service replacement.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Diagram excerpt
Dosing pump motor, position 13. Distinguish a motor fault from an electronics fault or mechanical blockage. Not a complete station.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Diagram excerpt
Replacement dosing pump cover, position 14. Replaces a damaged cover; the tube, motor and electronics are separate components.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Device identification
Control panel for pH Expert. Compare printing, buttons and original panel code. The chlorine version has a different reference.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Device identification
Control panel for Chlor Expert. Select by station identification; it does not replace the pH Expert panel.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
Device identification
Empty front and rear station casing. Replaces damaged station housing. The pump and control electronics are not included with the empty casing.
Match the original part code, station identification and connections. You are ordering the named replacement part, not a complete station. See the product page for details and supplied contents.
No matching parts. Try another query.
When servicing a dosing station, the pump, measuring probe, probe holder and electronics can be addressed separately. The full equipment model and original catalogue code help identify the part.
The newer holder has a ½″ connection and a PG13.5 thread for the probe. The older holder is listed for a 12 mm diameter probe. Choose the mounting method to match the original measuring assembly.
The range includes replacement tubes, a pump cover, motor and control boards. Electronics for pH and chlorine have their own applications. Diagnose a dosing fault first so that the component actually at fault is replaced.
pH and redox calibration solutions are available for maintaining the measuring system. Their use follows the particular station's procedure. Have a service technician carry out electrical repairs.